Construction of the first road link to Bonny Island in highly challenging environment and soil conditions

Construction of the first road link to Bonny Island in highly challenging environment and soil conditions

Construction of the first road link to Bonny Island in highly challenging environment and soil conditions

Bodo-Bonny Road, Rivers State

As the first road link between Bonny Island to the rest of Rivers State, the Bodo-Bonny road is a milestone infrastructure development project for the advancement of the Niger Delta and a catalyst for the continued success of Bonny Island – a key industrial area in Nigeria tied to the economic development and general wellbeing of the Nation as a whole.

This pioneer project is also a benchmark regarding financing cooperation between the private and public sectors, in reference to the special contractual conditions of part funding of 50% by Nigeria LNG Limited (NLNG).

Technically, the road is a massive undertaking with many construction challenges due to the low lying marshy area, muddy and swampy soil conditions and considerable tidal movements. The scope comprises construction of a 39 km long road, cross culverts and two mini bridges with a span of 23 m each as well as two creek bridges, Afa Creek Bridge of about 530 m length and Nanabie Creek Bridge of about 640 m length, in addition to the construction of a major river bridge of about 750 m length over the Opobo Channel.

Substantial dredging activities and a number of specialized soil stabilization methodologies are being carried out. Incremental launching is utilized for bridge construction. The highly mechanized method consists of manufacturing the superstructure of the bridge by sections in a prefabrication area behind one of the abutments with each new unit concreted directly against the preceding one – after it has hardened the resultant structure is launched forward over temporary sliding bearings.

15018104_screenshot202202231032432_jpegbef399647630a1239abea64b70b33ee6-300x171 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018098_screenshot202202231032162_jpegc497090b59538ceff8a7ed918326ba26-300x169 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018097_screenshot202202231031472_jpeg9d2c52d9290009b0cc65f467b7d90563-300x167 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018095_screenshot202202231030442_jpeg9a1b5d08ec396523c49dc1f33d0930ac-300x168 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018096_screenshot202202231031152_jpegd332df774c58e03b5de3ddd98819edee-300x165 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018107_screenshot202202231034132_jpeg5f70bcc622786c903c22cfb6bc28e803-300x167 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions 15018106_screenshot202202231033452_jpegdba0ab718b7581477dc3805835cb420c-300x171 Construction of the first road link to Bonny Island in highly challenging environment and soil conditions